Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Select Course Admin from the Navigation Bar

  2. Select Manage Dates under the Site Resources section

  3. Check the box next to all the assignments, quizzes, discussions, etc. to be edited

    1. Use the checkbox at the top of the table to Select All

    2. Image RemovedImage Added

  4. Click the Bulk Edit Dates button at the top of the table

  5. Set the start, end, and/or due dates as desired

    1. Image RemovedImage Added

  6. Click Save

Bulk Offset Dates

Note

In the Manage Dates tool, you’ll notice that assessments are listed as well as the grade book column (“Grade Item”) associated with them. We recommend not putting dates on Grade Items but only on the quiz, assignment, or discussion assessments themselves. See image below.

image-20241121-155020.pngImage Added

  1. Select Course Admin from the Navigation Bar

  2. Select Manage Dates under the Site Resources section

  3. Check the box next to all the assignments, quizzes, discussions, etc. to be edited

    1. Use the checkbox at the top of the table to Select All

    2. Image RemovedImage Added

  4. Click the Bulk Offset Dates button at the top of the table

  5. Check off which dates should be offset

  6. Select either Offset by direction and range or Calculate range between two dates

    1. Offset by direction and range:

      1. Use this if you know you need to move the dates by a set number of days or hours (e.g. 7 days, or 12 hours)

      2. Use the drop-down menus under Days and Hours to set the direction to move the date (forward/backward)

      3. Enter the number of days and hours in their respective boxes

      4. Click Save

    2. Calculate range between two dates:

      1. Use this if you’re uncertain of the exact range the dates need to move by, or need to move the dates over a more significant figure of time.

      2. Provide one of the original dates in the From box (eg. 09/12/2023)

      3. Provide the desired due date in the To box (eg. 08/29/2023)

      4. Image RemovedImage Added

      5. Click save, all the checked dates will be adjusted by the same offset (17 days in this example)